In Due Diligence and Massing Study or while preparing Techno-commercial physibility report our scope of work is as follows:
- Initial scrutiny
- Study 7/12 extracts, demarcation, other relevant revenue records, site survey (with contour), DP plan extract, RP Plan, CTS extract, Gaon Nakasha, Satellite image.
- Identify discrepancies in area, site boundaries and any other relevant to approvals.
- Stringent boundary
- Super impose the demarcation, site survey, DP plan extract, satellite image and identify a stringent boundary for the purpose of the massing study.
- Tentative zoning
- Work out a tentative site zoning including roads, DP reservations, residential/commercial or any other zone boundaries, water body etc.
- Conduct massing study
- Obtain site co-ordinates through google earth and estimate permissible height as per the colour coded zoning map of MOD
- Prepare tentative architectural blocks
- Test fit tentative architecture blocks
- FSI / Area statement
- Calculate the approximate maximum permissible potential of the property
- Prepare a tentative maximum permissible area statement.
- Calculate FSI Consumption based on the massing study and prepare a tentative proposed area statement
- Prepare due-diligence report :
- List down discrepancies in the stringent boundary and zoning.
- Note down critical observations of the massing study.
- Make a tentative combined area statement of permissible and proposed FSI of the plot.
- Note down critical observations of area statement
- List assumptions made while preparing the due diligence report.
- Approvals Brief :
- List down applicable development control rules with respect to the proposed use for the client/project proponent and the design architect for reference during the design process (Eg: residential/commercial etc.)
- Guidelines of the following points are covered:
- Reservation and amenity space
- Front and side marginal space
- Permissible height
- Parking requirement
- Structures considered in FSI
- Structures excluded from FSI
- Premium & Statutory charges table
- Services consideration
- Approvals activity flow chart